Bringing structure to life through expert building repair services.

Arkon Network
Arkon Network
  • Home
  • Who we are
  • Services
  • Our projects
  • Products
  • Careers
  • Contact us

Silo 7 Retrofitting- Cement of Sibline

Project Insights

Project Insights

Project Insights

Client: Cement of Sibline s.a.l

Consultant: Nabil Hannawi

Contract: 500K


The existing silo exhibited advanced reinforcement corrosion, significant concrete degradation, and reduced load-bearing capacity due to prolonged exposure to aggressive environmental conditions. A

two-phase rehabilitation strategy was implemented to address these deficiencies while ensuring structural continuity and long-term performance.

Challenges

Project Insights

Project Insights

A two-phase structural rehabilitation project aimed at halting active corrosion and restoring structural load-bearing capacity. The intervention ensures long-term durability and prevents critical structural failure through a full concrete jacketing system

.

  • Hidden Structural Deficiencies - Previously undetected reinforcement deterioration revealed during demolition, resulting insignificant increase in repair scope
  • Inadequate Reinforcement - Anchorage Existing steel exhibited insufficient bond and anchorage capacity, requiring redesign ofload transfer mechanism
  • Complex Vertical Execution - Constraints Work executed on a 27 m high cylindrical structure requiring controlled sequencing,access management, and safety compliance

  • Home
  • Who we are
  • Services
  • Our projects
  • Products
  • Careers
  • Contact us

Arkon Network

Habib Publishers Street & Zouq Mkayel, Lebanon

Tel: +961 3 565 540 - +961 9 217 018

Copyright © 2026 ARKON Network - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept