Bringing Structure to Life

Teampro ltd
Teampro ltd
  • Home
  • Who we are
  • Services
  • Our projects
  • Products
  • Job
  • Contact us

Welcome to Teampro ltd Construction Company.

Project Insights

Project Insights

Project Insights

Client: Cement of Sibline s.a.l

Consultant: Nabil Hannawi

Contract: 500K


The existing silo exhibited advanced reinforcement corrosion, significant concrete degradation, and reduced load-bearing capacity due to prolonged exposure to aggressive environmental conditions. A

two-phase rehabilitation strategy was implemented to address these deficiencies while ensuring structural continuity and long-term performance.

Chalenge

Project Insights

Project Insights

A two-phase structural rehabilitation project aimed at halting active corrosion and restoring structural load-bearing capacity. The intervention ensures long-term durability and prevents critical structural failure through a full concrete jacketing system.

  • Hidden Structural Deficiencies - Previously undetected reinforcement deterioration revealed during demolition, resulting insignificant increase in repair scope
  • Inadequate Reinforcement - Anchorage Existing steel exhibited insufficient bond and anchorage capacity, requiring redesign ofload transfer mechanism
  • Complex Vertical Execution - Constraints Work executed on a 27 m high cylindrical structure requiring controlled sequencing,access management, and safety compliance

Copyright © 2026 Teampro ltd - All Rights Reserved.

Powered by

  • Home
  • Who we are
  • Services
  • Our projects
  • Products
  • Job
  • Contact us

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept