Client: Cement of Sibline s.a.l
Consultant: Nabil Hannawi
Contract: 500K
The existing silo exhibited advanced reinforcement corrosion, significant concrete degradation, and reduced load-bearing capacity due to prolonged exposure to aggressive environmental conditions. A
two-phase rehabilitation strategy was implemented to address these deficiencies while ensuring structural continuity and long-term performance.
A two-phase structural rehabilitation project aimed at halting active corrosion and restoring structural load-bearing capacity. The intervention ensures long-term durability and prevents critical structural failure through a full concrete jacketing system.





